12.4 hectares of land is allocated for residential and community uses on the north eastern edge of Great Barton.
The total capacity of the site should be determined through a site Development Brief, with up to 40 dwellings permitted in the period to 2031.
The amount of land available for development, types and location of uses, access arrangements, design and landscaping will be informed by a Development Brief for the whole 12.4 ha site. The Development Brief should set out how the community uses on the site will be delivered. Applications for planning permission will only be determined once the development brief has been adopted by the local planning authority.
Access to the site will be from Mill Road (B1106). Development on the site must make provision for the potential expansion needs of Great Barton Primary School.
Development on the site will need to respect and respond appropriately to issues of congestion, air quality and noise management.
The development area must provide enhanced footpath and cycleway access to the village centre and areas of public open space.
Strategic landscaping and open space must be provided to address the sites requirements and location.